Report Contents (click to jump to a section):
- R1 - Northern Region, Occurring in more than one Forest (excluding Regionwide)
- Idaho Panhandle National Forest, Forestwide (excluding Projects occurring in more than one Forest)
- Idaho Panhandle National Forest, Occurring in more than one District (excluding Forestwide)
- Idaho Panhandle National Forest , Avery Ranger District
- Idaho Panhandle National Forest , Bonners Ferry Ranger District
- Idaho Panhandle National Forest , Fernan Ranger District
- Idaho Panhandle National Forest , Idaho Panhandle National Forest All Units
- Idaho Panhandle National Forest , Priest Lake Ranger District
- Idaho Panhandle National Forest , Sandpoint Ranger District
- Idaho Panhandle National Forest , St. Maries Ranger District
- Idaho Panhandle National Forest , Wallace Ranger District
| R1 - Northern Region, Occurring in more than one Forest (excluding Regionwide) | |||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
| Upper Lochsa Land Exchange EIS |
- Land ownership management | In Progress DEIS NOA in Federal Register 11/18/2011 Est. FEIS NOA in Federal Register 10/2013 |
Expected: 10/2013 | 01/2014 | Teresa Trulock 208-935-4256 ttrulock@fs.fed.us |
| Description: The Forest Service (FS) is considering a land exchange with Western Pacific Timber. The FS would receive approx. 40,000 acres of WPT land in the upper Lochsa River drainage and WPT would recieve an equal value of Forest Service land in north Idaho. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=26227 | |||||
| Location: UNIT - Sandpoint Ranger District, Palouse Ranger District, North Fork Ranger District, Powell Ranger District, Clearwater Ranger District, Red River Ranger District. STATE - Idaho. COUNTY - Benewah, Bonner, Clearwater, Idaho, Kootenai, Latah. The lands to acquire are in the upper Lochsa River drainage on the border of ID and MT. The federal lands to exchange out of are scattered on the Idaho Panhandle, Clearwater, and Nez Perce NF's. | |||||
| Back To Top | |||||
| Idaho Panhandle National Forest, Forestwide (excluding Projects occurring in more than one Forest) | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| IPNF Noxious Weed Treatment Project EIS |
- Vegetation management (other than forest products) | In Progress NOI in Federal Register 10/28/2011 Est. DEIS NOA in Federal Register 07/2013 |
Expected: 11/2013 | 06/2014 | David Cobb 208-443-6854 dcobb@fs.fed.us |
| Description: Management of non-native invasive plant species utilizing herbicides, biological control agents, cultural and mechanical methods for weed control. | |||||
| Location: UNIT - Idaho Panhandle National Forest All Units. STATE - Idaho, Montana, Washington. COUNTY - Benewah, Bonner, Boundary, Clearwater, Kootenai, Latah, Shoshone, Lincoln, Sanders, Pend Oreille. Various locations across the forest | |||||
| Idaho Panhandle and Kootenai National Forest, Forest Plan Revision EIS |
- Land management planning | In Progress DEIS NOA in Federal Register 01/13/2012 Est. Objection Period Legal Notice 06/2013 |
Expected: 12/2013 | 01/2014 | Emily Williams 208-765-7417 emilywilliams@fs.fed.us |
| Description: Forest Plan Revision Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=894 | |||||
| Location: UNIT - Idaho Panhandle National Forest All Units. STATE - Idaho. COUNTY - Benewah, Bonner, Boundary, Clearwater, Kootenai, Latah, Shoshone. Northern Idaho | |||||
| NIC Outfitter Guide Special Use Permit CE |
- Special use management | In Progress 215 Comment Period Legal Notice 04/24/2012 |
Expected: 05/2013 | 07/2013 | Claire Pitner 208-769-3033 cpitner@fs.fed.us |
| Description: North Idaho College (NIC) has requested a temporary Outfitter Guide Special Use Permit to conduct guided activities such as cross-country skiing, avalanche education, kayaking, fly-fishing, hiking, biking and camping on the CDA River RD. | |||||
| Location: UNIT - Idaho Panhandle National Forest All Units. STATE - Idaho. COUNTY - Benewah, Bonner, Boundary, Kootenai, Shoshone. LEGAL - Multiple across the IPNFs. Specific open system trails, access sites, and dispersed campsites across the Idaho Panhandle National Forests. | |||||
| Back To Top | |||||
| Idaho Panhandle National Forest, Occurring in more than one District (excluding Forestwide) | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Authorization of Frontier Communication's Existing Telephone and Fiber Optic Lines CE |
- Special use management | Developing Proposal Est. 215 Comment Period Legal Notice 04/2013 |
Expected: 07/2013 | 08/2013 | Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us |
| Description: Special use authorization | |||||
| Location: UNIT - Sandpoint Ranger District, Bonners Ferry Ranger District, Priest Lake Ranger District. STATE - Idaho. COUNTY - Bonner, Boundary. Throughout North Idaho: Bonners Ferry, Priest Lake and Sandpoint Ranger Districts | |||||
| Selkirk Mountain Range Winter Travel Plan EIS |
- Recreation management | On Hold | N/A | N/A | Michael Thom 208-443-6839 mthom@fs.fed.us |
| Description: Travel management plan for motorized winter recreation use within the Selkirk Mountain Range on the Bonners Ferry, Priest Lake Ranger District and Sandpoint Ranger District. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=15349 | |||||
| Location: UNIT - Sandpoint Ranger District, Bonners Ferry Ranger District, Priest Lake Ranger District. STATE - Idaho, Washington. COUNTY - Bonner, Boundary, Pend Oreille. Priest Lake, Sandpoint, and Bonners Ferry Ranger Districts | |||||
| Back To Top | |||||
| Idaho Panhandle National Forest , Avery Ranger District | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Larch Gold CE |
- Vegetation management (other than forest products) | In Progress 215 Comment Period Legal Notice 10/26/2012 |
Expected: 05/2013 | 09/2013 | Kaysee Miller 208-245-6230 kayseejmiller@fs.fed.us |
| Description: The Larch Gold Project Area is located in the Simmons Creek Drainage of the St. Joe River approximately 24 miles east of Avery, Idaho. The project will consist of commercial thinning on approzimately 62 acres. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40554 | |||||
| Location: UNIT - Avery Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - Section 10, T44N, R9E, B.M. Project #4 - Approximately 24 miles east of Avery, Idaho in the Simmons Creek Drainage | |||||
| Quartz Beetle CE |
- Vegetation management (other than forest products) | Analysis Completed | Expected: 04/2013 Actual: 04/23/2013 |
09/2013 | Kaysee Miller 208-245-6230 kayseejmiller@fs.fed.us |
| Description: The Quartz Beetle project is 19 miles East of Avery in the Quartz Creek drainage of the St Joe River. The Project will consist of commercial thinning on approzimately 65 acres. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40091 | |||||
| Location: UNIT - Avery Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T45N, R8E, Sec: 14, 15, B.M. Project #5 - 19 miles east of Avery in the Quarz Creek area | |||||
| Simmons CE |
- Vegetation management (other than forest products) - Wildlife, Fish, Rare plants - Fuels management |
In Progress 215 Comment Period Legal Notice 04/08/2013 |
Expected: 05/2013 | 09/2013 | Ryan Shannahan 208-245-6210 rmshannahan@fs.fed.us |
| Description: Rx burning w/ some planting on 8500 acres to facilitate fire mgmt; reduce natural fuels; provide protection to values at risk; enhance conditions for regeneration of whitebark pine, WP & WL; enhance fire resiliency; increase forage for big game. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39859 | |||||
| Location: UNIT - Avery Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - Multiple sections in T42N, R9E; T43N, R9E; T44N, R9E; T44N, R10E; T44N, R11E Project #4 - Upper St. Joe River Drainage in Simmons, Washout, Goat, Wampus, Indian, Bonehead, Red Ives, Bedrock, Color, and Game Creeks | |||||
| St. Joe Travel Management Plan EA |
- Recreation management - Road management |
In Progress 215 Comment Period Legal Notice 09/11/2009 |
Expected: 05/2013 | 05/2013 | Mary Price 208-245-6022 mprice@fs.fed.us |
| Description: Designating roads and trails for public motorized vehicle use on the St. Joe Ranger District. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=26188 | |||||
| Location: UNIT - Avery Ranger District, St. Maries Ranger District. STATE - Idaho. COUNTY - Benewah, Clearwater, Latah, Shoshone. St. Joe Ranger District including Avery RD & St. Maries RD | |||||
| Back To Top | |||||
| Idaho Panhandle National Forest , Bonners Ferry Ranger District | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Bailey Special Use Permit Reissuance CE *NEW LISTING* |
- Special use management | In Progress 215 Comment Period Legal Notice 04/26/2013 |
Expected: 05/2013 | 05/2013 | Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us |
| Description: This private road special use permit and water transmission line has expired and needs to be reissued for a new 20 year term. These are existing uses and there is no change in scope necessary. | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - NW1/4 NW1/4 Section 9, T64N, R1E, B.M. Mission Creek | |||||
| Bigsby Special Use Permit Reissuance CE *NEW LISTING* |
- Special use management | In Progress 215 Comment Period Legal Notice 04/26/2013 |
Expected: 05/2013 | 05/2013 | Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us |
| Description: This private road special use permit has expired and needs to be reissued for a new 20 year term. This is an existing use and there is no change in scope necessary. | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - SW1/4 SW1/4 Section 36, T64N, R1E, B.M. Camp Nine | |||||
| Brezina Water Transmission Line Special Use Permit Reissuance CE |
- Special use management | Developing Proposal Est. 215 Comment Period Legal Notice 04/2013 |
Expected: 07/2013 | 07/2013 | Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us |
| Description: This existing water transmission line special use permit, issued for the operation and maintenance of two water diversion structures and two water lines to supply water to a private residence, has expired and needs reissued for a new term. | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - NW1/4 SE1/4 Section 10, T64N, R2E, B.M. Bussard Lake | |||||
| Coble Special Use Permit Reissuance CE *NEW LISTING* |
- Special use management | In Progress 215 Comment Period Legal Notice 04/26/2013 |
Expected: 05/2013 | 05/2013 | Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us |
| Description: This water transmission line has expired and needs to be reissued for a new 30 year term. This is an existing use and there is no change in scope necessary. | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - SW1/4 NW1/4 Section 2, T63N, R2E, B.M. McDougal Creek | |||||
| Elk Mountain Farms Water Diversion and Transmission Special Use Permit CE |
- Special use management | In Progress Scoping Start 04/01/2010 Est. 215 Comment Period Legal Notice 04/2013 |
Expected: 07/2013 | 08/2013 | Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us |
| Description: Issue a Special Use Permit for maintenance and use of an existing water system. | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - Section 22, T64N, R1W, B.M. Fisher Creek drainage. Project #33 | |||||
| Hall Mission to Drill Exploration Project CE |
- Minerals and Geology | In Progress Scoping Start 04/24/2013 Est. 215 Comment Period Legal Notice 05/2013 |
Expected: 06/2013 | 07/2013 | Timothy Sadler 208-765-7206 tjsadler@fs.fed.us |
| Description: Eight sites on existing road prisms used for drill core mineral exploration. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40097 | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - Sections 9, 11, 14 and 18-21, T65N, R1E, B.M. Mission Creek drainage. Project #13 | |||||
| Hellroaring EA |
- Forest products - Fuels management - Vegetation management (other than forest products) - Watershed management |
Developing Proposal Est. Scoping Start 05/2013 |
Expected: 04/2014 | 09/2015 | Douglas Nishek 208-267-6765 dnishek@fs.fed.us |
| Description: Vegetation management and fuels reduction. | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - T64N, R1E, Sections 1, 2, 3, 11, 12, 13; T65N, R1E, Sections 35 and 36; T65N, R2E, Sections 28, 29, 30, 31, 32, 33, 34;T64N, R2E, Sections 3, 4, 5, 6, 7, 8, 9, 16, 17, 18, Boise Meridian. The project encompasses the Hellroaring Creek drainage and is bordered by Round Prairie to the north, Tungsten Mountain to the southwest, and Bussard Mountain to the south. Project #20 | |||||
| Idaho Buckhorn CE |
- Fuels management | In Progress 215 Comment Period Legal Notice 03/20/2013 |
Expected: 06/2013 | 09/2014 | Jennifer Anderson 208-267-6758 jlanderson02@fs.fed.us |
| Description: Wildlife habitat and big game browse improvement. Also, use prescribed fire to reduce fuels. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40342 | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho, Montana. COUNTY - Bonner, Lincoln. LEGAL - Boise Meridian - T64N, R3E, Sections 15, 16, 20-22, 27-29, 32-34, and T63N, R3E, Sections 3, 4, 9, 10, 15. Principal Meridian - T36N, R34W, Sections 20, 29, 32 and T35N, R34W, Sect. 5, 8, 9, 17 West of Buckhorn Ridge in the Miller, Faro and Keno Creek drainages. The project area is bounded by Deer Creek to the west, Canuck Basin to the north and Buckhorn Ridge to the east. Project #14 | |||||
| Kreist Creek EA |
- Vegetation management (other than forest products) - Forest products - Watershed management - Fuels management |
In Progress 04/19/2013 Est. 09/2013 |
Expected: 12/2013 | 08/2014 | Shanna Kleinsmith 208-267-6729 skleinsmith@fs.fed.us |
| Description: Vegetation and fuels management to reduce the risk of high-severity wildfires. Maintain and improve aquatic habitat and watershed health. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40768 | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - T64N, R2E, Sections 1, 2, 3, 11, 12, 13, 14, 23, 24, 25, 26, 35, 36. T64N, R3E, Sections 6, 7, 8, 18, 19, 30, 31, 32. T63N, R2E, Sections 1, 2, 11, 12, T64N, R3E, Sections 5, 6, 7. B.M. Bordered by Deer Ridge to the east, the Moyie River to the West, and the Meadow Creek Campground to the South. Encompasses the Feist, Kreist, Snyder and Placer Creek drainages. Project #24 | |||||
| Nelson Private Road Special Use Permit Reissuance CE |
- Special use management | Developing Proposal Est. 215 Comment Period Legal Notice 04/2013 |
Expected: 07/2013 | 07/2013 | Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us |
| Description: This private road special use permit has expired and needs to be reissued for a new term. This existing private road is 0.21 miles in length and 12 feet in width and the only feasible legal access for a private inholding. | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - NE1/4 Section 4, T64N, R1E Mission Creek Watershed | |||||
| Plantz Special Use Permit Reissuance CE *NEW LISTING* |
- Special use management | In Progress 215 Comment Period Legal Notice 04/26/2013 |
Expected: 05/2013 | 05/2013 | Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us |
| Description: This water transmission line has expired and needs to be reissued for a new 30 year term. This is an existing use and there is no change in scope necessary. | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - SW1/4 SW1/4 Section 34, T64N, R1E, B.M. Deer Park | |||||
| Schnuerle Special Use Permit Reissuance CE *NEW LISTING* |
- Special use management | In Progress 215 Comment Period Legal Notice 04/26/2013 |
Expected: 05/2013 | 05/2013 | Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us |
| Description: This water transmission line has expired and needs to be reissued for a new 30 year term. This is an existing use and there is no change in scope necessary. | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - S1/2 Section 32, T63N, R2E, B.M. Fry Creek | |||||
| Twenty Mile Creek EA |
- Vegetation management (other than forest products) | In Progress 215 Comment Period Legal Notice 04/05/2013 |
Expected: 09/2013 | 02/2014 | Douglas Nishek 208-267-6765 dnishek@fs.fed.us |
| Description: Reduce the risk of sediment entering the drinking water through road improvements, road decommissioning, vegetation and fuels management, and to improve grizzly bear habitat. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37730 | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - T61N, R1E, Sections 25, 26, 35, 36. T61N, R2E, Sections 30, 31. T60N, R1E, Sections 1, 2, 12. T60N, R2E, Sections 6, 7, 18. BM Twenty Mile Creek and Brown Creek drainages. Project #6 | |||||
| Back To Top | |||||
| Idaho Panhandle National Forest , Fernan Ranger District | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Elk W Trench CE |
- Minerals and Geology | Developing Proposal Est. 215 Comment Period Legal Notice 06/2013 |
Expected: 09/2013 | 06/2014 | Kevin Knesek 208-765-7442 ksknesek@fs.fed.us |
| Description: Brushing existing trenches and access roads, performing geophysical surveys and geochemical surveys. | |||||
| Location: UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Kootenai. LEGAL - T49N, R2W, Sections 7, 8, 17, 18, B.M. (Project #25). Beauty Creek drainage, west of Elk Mountain, near Mineral Ridge | |||||
| Fernan Rod & Gun Club Permit Re-Issue EA |
- Special use management | On Hold | N/A | N/A | Debbie Butler (208) 443-6822 dabutler@fs.fed.us |
| Description: To authorize the continued operation and maintenance of a target range. The target range has operated under the special use permit since 1990. Permit may be issued for up to a 20-year term. | |||||
| Location: UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Kootenai. LEGAL - T50 N, R3W, NE1/4, NW1/4 Section 2, B.M., Project #3 Fernan Hill/Smith Gulch | |||||
| Hayden Bluff Lane Road User Association Private Access Road Reissuance CE |
- Special use management | Analysis Completed | Expected: 05/2013 Actual: 04/25/2013 |
05/2013 | Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us |
| Description: This private road special use permit has expired and needs to be reissued for a new term. This is an existing private access road 1,040 feet in length and 17 feet in width and the only legal access for two private inholdings. | |||||
| Location: UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Kootenai. LEGAL - SW1/4 SW1/4 Section 9, T51N, R3W, B.M. English Point, Hayden Lake | |||||
| Idaho Fish & Game Trail Creek Facility Authorization CE |
- Special use management | In Progress Scoping Start 07/01/2010 Est. 215 Comment Period Legal Notice 06/2013 |
Expected: 07/2013 | 08/2013 | Joseph Holzinger 661-296-9710 jholzinger@fs.fed.us |
| Description: Occupying facility. | |||||
| Location: UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T52N, R2E, sec. 19, B.M., Project #1. Trail Creek drainage, adjacent to Forest Service Road 422. | |||||
| Jeffrey Water Transmission Line Special Use Permit Reissuance CE |
- Special use management | Analysis Completed | Expected: 05/2013 Actual: 04/25/2013 |
05/2013 | Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us |
| Description: The Jeffrey water transmission line special use permit has expired and needs to be reissued for a new term. This is an existing line for the use and maintenance of a section of water pipeline (700 ft x 3 ft) across NFS lands for residential purposes. | |||||
| Location: UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Kootenai. LEGAL - SW1/4 SW1/4 Section 9, T51N, R3W, B.M. English Point, Hayden Lake | |||||
| Prospecting Duke CE |
- Minerals and Geology | Developing Proposal Est. 215 Comment Period Legal Notice 04/2013 |
Expected: 06/2013 | 07/2013 | Kevin Knesek 208-765-7442 ksknesek@fs.fed.us |
| Description: Trenching 250" x 30' with 200' temporary access road, gravel will be hauled offsite (private) to process for gold and reeturned for reclamation. | |||||
| Location: UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T49N, R4W, Section 4, B.M. Project # 22 - Prospect Gulch south of Babins Junction on the Coeur d'Alene river Ranger District | |||||
| Reissuance of Kootenai Electric Cooperative's Authorization CE |
- Special use management | On Hold | N/A | N/A | Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us |
| Description: Maintenance of electrical rights-of-way | |||||
| Location: UNIT - Fernan Ranger District. STATE - Idaho. COUNTY - Kootenai. LEGAL - T48N, R2W, sec. 28; T48N, R4W, sec. 25; T50N, R3W, sec. 3, 4; T51N, R3W, sec. 1, 11, 23; T51N, R4W, sec. 34; T53N, R4W, sec. 27; T54N, R2W, sec. 14, 22, 26, 27, BM. Multiple locations on the District. | |||||
| Back To Top | |||||
| Idaho Panhandle National Forest , Idaho Panhandle National Forest All Units | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| East-West Access Around Continental Mountain EA |
- Road management | In Progress Scoping Start 02/06/2013 Est. 215 Comment Period Legal Notice 06/2013 |
Expected: 09/2013 | 07/2014 | Christine Dawe 208-765-7220 cdawe@fs.fed.us |
| Description: Providing safe east-west access across the Selkirk Mtns for U.S. Border Patrol agents by reconstructing portions of the Bog Creek Road (Forest Roads 1013 and 2450). Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41296 | |||||
| Location: UNIT - Bonners Ferry Ranger District. STATE - Idaho. COUNTY - Boundary. LEGAL - T65N, R4W, Sections 8, 9, 10, 15, 17, 19 and T65N, R5W, Section 24 Selkirk Mountains of northern Idaho within 2 miles of the Canadian border. | |||||
| Elkins Resort Permit Renewal CE |
- Special use management | Developing Proposal Est. 215 Comment Period Legal Notice 06/2013 |
Expected: 12/2013 | 01/2014 | Debbie Butler (208) 443-6822 dabutler@fs.fed.us |
| Description: Permit renewal | |||||
| Location: UNIT - Priest Lake Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - T61N, R4W, Section 19, B.M. Reeder Bay of Priest Lake | |||||
| Back To Top | |||||
| Idaho Panhandle National Forest , Priest Lake Ranger District | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Priest River Experimental Forest Continuing Education Project CE |
- Forest products | In Progress 215 Comment Period Legal Notice 10/16/2012 |
Expected: 04/2013 | 06/2013 | Luke Hixson 208-443-6809 lhixson@fs.fed.us |
| Description: A series of commercial thinnings to demonstrate logging practices. Thinning would focus on removing trees with low crown ratios, weak boles, and poor form. | |||||
| Location: UNIT - Priest Lake Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - T58N, R4W, Sections 27 and 28, B.M. Priest River Experimental Forest. Project #17 | |||||
| Selkirk Guiding and Outfitting - Trail Ride Ammendment CE |
- Special use management | In Progress 215 Comment Period Legal Notice 05/08/2012 |
Expected: 04/2013 | 06/2013 | Debbie Butler (208) 443-6822 dabutler@fs.fed.us |
| Description: Guided horseback rides parallel to existing roads near the Priest Lake Ranger District. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39658 | |||||
| Location: UNIT - Priest Lake Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - T61N, R5W, Sections 14, 22, 23, and 15, B.M. Project #5 Nordman, Reeder Creek, and Bismarck Guard Station. | |||||
| Solo Quartz Crystal Management Area CE |
- Minerals and Geology | On Hold | N/A | N/A | Kevin Knesek 208-765-7442 ksknesek@fs.fed.us |
| Description: Setting up management parameters for removing crystal material from the site | |||||
| Location: UNIT - Priest Lake Ranger District. STATE - Washington. COUNTY - Pend Oreille. LEGAL - T34N R45E Section 1, Willamette Meridian Project #16 - Solo Creek drainage approximately one mile up Road #659. | |||||
| Back To Top | |||||
| Idaho Panhandle National Forest , Sandpoint Ranger District | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Falling Drill CE |
- Minerals and Geology | On Hold | N/A | N/A | Kevin Knesek 208-765-7442 ksknesek@fs.fed.us |
| Description: Drill core mineral exploration. One drill site is proposed (up to nine holes drilled from one location). | |||||
| Location: UNIT - Sandpoint Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - T.54N., R.1W., Section 1, BM, Project # 18 Falls Creek. Forest Road 1088 to Falls Creek mine site | |||||
| Schweitzer Fuels Reduction CE |
- Fuels management | Analysis Completed | Expected: 04/2013 Actual: 04/02/2013 |
06/2013 | Sara Savage 208-443-6834 sesavage@fs.fed.us |
| Description: Fuels treatment. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=32709 | |||||
| Location: UNIT - Sandpoint Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - Sections 26, 27, and 34, T 58 N, R 2 W, B.M. Sand Creek and Schweitzer Creek, Project # 30 | |||||
| Southworth Private Road Special Use Permit Reissuance CE |
- Special use management | Developing Proposal Est. 215 Comment Period Legal Notice 04/2013 |
Expected: 07/2013 | 07/2013 | Joseph Holzinger 208-765-7279 jholzinger@fs.fed.us |
| Description: This private road special use permit has expired and needs reissued for a new term. This existing private road is 600 feet in length and 14 feet in width and the only feasible legal access for a private inholding. | |||||
| Location: UNIT - Sandpoint Ranger District. STATE - Idaho. COUNTY - Bonner. LEGAL - NW1/4 NW1/4 Section 24, T55N, R4W Hoodoo Creek Watershed | |||||
| Back To Top | |||||
| Idaho Panhandle National Forest , St. Maries Ranger District | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Marble Creek Splash Dam Fish Passage Project CE |
- Wildlife, Fish, Rare plants | In Progress 215 Comment Period Legal Notice 04/26/2012 |
Expected: 05/2013 | 08/2013 | Lisa Hawdon 208-245-6045 lhawdon@fs.fed.us |
| Description: The St. Joe Ranger District is partnering with the USFWS, Idaho DEQ, Idaho Dept. of Fish & Game, and Avista Corp to breach two historic splash dams on Marble Creek to increase amount of habitat available for bull trout. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39210 | |||||
| Location: UNIT - St. Maries Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - Section 1, T43N, R3E, BM Several miles upstream of the creek's confluence with the St. Joe River within the U.S. Forest Service's Grandmother Mountain Roadless Area. | |||||
| Windy Larch CE |
- Vegetation management (other than forest products) - Forest products |
Analysis Completed | Expected: 04/2013 Actual: 04/04/2013 |
08/2013 | Lynette Myhre 208-245-6034 lmyhre@fs.fed.us |
| Description: Commercial thinning on approx. 70 acres using skyline and tractor logging systems to improve the health and vigor of the remaining trees, maintain long-lived early-seral tree species, and provide timber products. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37600 | |||||
| Location: UNIT - St. Maries Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - Section 5, T42N, R3E, BM Project #7 - 10 miles NW of Clarkia, ID in the Windy Creek and Gold Center Drainages of the St. Maries River | |||||
| Wooden Spur Resource Management Project EA |
- Watershed management - Vegetation management (other than forest products) - Forest products - Fuels management |
In Progress Scoping Start 07/13/2012 Est. 215 Comment Period Legal Notice 05/2013 |
Expected: 12/2013 | 07/2014 | Timothy Price 208-245-6049 tprice@fs.fed.us |
| Description: Vegetation management and water quality improvement in the Cat Spur Drainage on the St. Joe Ranger District Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39858 | |||||
| Location: UNIT - St. Maries Ranger District. STATE - Idaho. COUNTY - Clearwater, Shoshone. LEGAL - T41N, R2E, Sections 5 & 6; T42N, R2E, Sections 19-22, 27-30, 31-33 Project #3 - Cat Spur Drainage in the West Fork St. Maries River Drainage on the St. Joe Ranger District | |||||
| Back To Top | |||||
| Idaho Panhandle National Forest , Wallace Ranger District | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Beaver Creek EIS |
- Forest products - Watershed management - Road management - Fuels management - Vegetation management (other than forest products) |
In Progress NOI in Federal Register 01/22/2013 Est. DEIS NOA in Federal Register 04/2013 |
Expected: 07/2013 | 09/2013 | Lauren Goschke 208-769-3046 lgoschke@fs.fed.us |
| Description: Proposed watershed improvement, commercial timber harvest, hazardous fuels treatment, fuelbreak construction, reforestation, and associated road management. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40488 | |||||
| Location: UNIT - Wallace Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T50N R4E, sections 31-35; T49N R3E, sections 1, 12, 13, 24; T49N R4E, sections 1-36; T49N R5E, sections 7, 17-21, 28-32; T48N R5E, section 6; T48N R4E, sections 1-4, 9-11; BM. (Project #2). North to south from Babins Junction to Dago Peak; east to west from White Peak to Fulkerson Peak. | |||||
| Double Placer CE |
- Minerals and Geology | Developing Proposal Est. 215 Comment Period Legal Notice 05/2013 |
Expected: 08/2013 | 06/2014 | Kevin Knesek 208-765-7442 ksknesek@fs.fed.us |
| Description: Excavate panel 600' x 30' x 10' and haul pay gravel offsite (private) to process for gold. Gravel returned for reclamation. | |||||
| Location: UNIT - Wallace Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T49N, R4E, Section 11, B.M. (Project #18). Placer Gulch east of Delta, ID on FR605 in the Trail Creek Drainage | |||||
| Moon Digs CE |
- Minerals and Geology | Developing Proposal Est. 215 Comment Period Legal Notice 06/2013 |
Expected: 08/2013 | 06/2014 | Kevin Knesek 208-765-7442 ksknesek@fs.fed.us |
| Description: Underground mineral exploration involving hand drilling, sampling, and mapping existing adits. | |||||
| Location: UNIT - Wallace Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T49N, R3E, Section 26, B.M. (Project #23). W. F. Moon Gulch north of Osburn, ID on County Road #930 | |||||
| NIC Yurt Special Use Permit CE |
- Special use management | On Hold | N/A | N/A | Claire Pitner 208-769-3033 cpitner@fs.fed.us |
| Description: North Idaho College (NIC) is requesting a Special Use Permit to construct a yurt on West Willow Peak to be used for academic and extracurricular programs, such as avalanche education, natural resource management, etc. | |||||
| Location: UNIT - Wallace Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T47N, R5E, Section 11, B.M. Near West Willow Peak in the Boulder Creek drainage, Project #9 | |||||
| Progress Camp Drill Core Exploration CE |
- Minerals and Geology | On Hold | N/A | N/A | Kevin Knesek 208-765-7442 ksknesek@fs.fed.us |
| Description: Lode mineral exploration consisting of drill holes in five different sites. | |||||
| Location: UNIT - Wallace Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T50N, R5E, Section 19 and T50N, R4E, Section 10, BM Map #7 - E. Fk. of Eagle Creek near Oregon Gulch and N. Fk. of the Coeur d'Alene River just upriver from the Shoshone Work Center | |||||
| Steamboat Snow Groomer Shed CE |
- Recreation management | On Hold | N/A | N/A | Andrew Boggs 208-769-3038 aboggs@fs.fed.us |
| Description: Construct a storage shed 70x24-foot pole building (wood with metal roof and sides) at Steamboat Trailhead for use by snow groomer. Construction/maintenance would be performed by Shoshone County and its Snowmobile Groomer Board. | |||||
| Location: UNIT - Wallace Ranger District. STATE - Idaho. COUNTY - Shoshone. LEGAL - T50N, R2E, Section 24, B.M. (Project #12). Steamboat Creek Trailhead, at the junciton of Shoshone County Road 1C and Forest Road 400. | |||||
| Back To Top | |||||