Report Contents (click to jump to a section):
- R1 - Northern Region, Occurring in more than one Forest (excluding Regionwide)
- Clearwater National Forest, Forestwide (excluding Projects occurring in more than one Forest)
- Clearwater National Forest , Clearwater National Forest All Units
- Clearwater National Forest , Lochsa Ranger District
- Clearwater National Forest , Nez Perce National Forest All Units
- Clearwater National Forest , North Fork Ranger District
- Clearwater National Forest , Palouse Ranger District
- Clearwater National Forest , Powell Ranger District
| R1 - Northern Region, Occurring in more than one Forest (excluding Regionwide) | |||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
| Clearwater-Nez Perce Forest Plan Revision EIS |
- Land management planning | On Hold | N/A | N/A | Barry Ruklic 208-983-4032 bruklic@fs.fed.us |
| Description: NOI to prepare an EIS to revise the Clearwater and Nez Perce National Forest Management Plans published 9/30/2004. Web Link: http://www.fs.fed.us/cnpz | |||||
| Location: UNIT - Clearwater National Forest All Units, Nez Perce National Forest All Units. STATE - Idaho. COUNTY - Idaho. Nez Perce and Clearwater National Forests | |||||
| Nez Perce-Clearwater Roadside Hazard Tree Project EA |
- Vegetation management (other than forest products) - Road management - Forest products |
In Progress 215 Comment Period Legal Notice 05/03/2013 |
Expected: 06/2013 | 10/2013 | Mark Craig 208-935-4254 mdcraig@fs.fed.us |
| Description: Removal of hazard trees for public and employee safety on 1,700 acres 200 feet on up to either side of approximately 43 miles of roads resulting from the Sheep, McGuire, and Fern wildfires of 2012. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41316 | |||||
| Location: UNIT - Powell Ranger District, Salmon River Ranger District, Red River Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - McGuire T26 N, R08E, Sections 1, 2, 3, 9, 10, 11,12, 13, 14, 15, 16, 21; T26N, R09E, Sections: 6, 7, 18, 19, T27 N, R08E, Sections 21,22, 24, 25,26, 27, 35, 36; Sheep: T26N, R02E, Sections 1, 3, 10, 1 Sheep Fire (Salmon River Ranger District), McGuire Complex (Red River Ranger District), and Fern Fire (Powell Ranger District | |||||
| Upper Lochsa Land Exchange EIS |
- Land ownership management | In Progress DEIS NOA in Federal Register 11/18/2011 Est. FEIS NOA in Federal Register 10/2013 |
Expected: 10/2013 | 01/2014 | Teresa Trulock 208-935-4256 ttrulock@fs.fed.us |
| Description: The Forest Service (FS) is considering a land exchange with Western Pacific Timber. The FS would receive approx. 40,000 acres of WPT land in the upper Lochsa River drainage and WPT would recieve an equal value of Forest Service land in north Idaho. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=26227 | |||||
| Location: UNIT - Sandpoint Ranger District, Palouse Ranger District, North Fork Ranger District, Powell Ranger District, Clearwater Ranger District, Red River Ranger District. STATE - Idaho. COUNTY - Benewah, Bonner, Clearwater, Idaho, Kootenai, Latah. The lands to acquire are in the upper Lochsa River drainage on the border of ID and MT. The federal lands to exchange out of are scattered on the Idaho Panhandle, Clearwater, and Nez Perce NF's. | |||||
| Back To Top | |||||
| Clearwater National Forest, Forestwide (excluding Projects occurring in more than one Forest) | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Lenore Tree Improvement Area Mineral Withdrawal Project EA |
- Special use management | In Progress 215 Comment Period Legal Notice 03/05/2010 |
Expected: 07/2010 | 09/2010 | Tammy Harding (208)935-2513 tharding@fs.fed.us |
| Description: Application for withdrawal from settlement, sale, location or entry under the general land laws, including the United States mining laws, 10 acres of Bureau of Land Management lands adjacent to the Lenore Tree Improvement Area. | |||||
| Location: UNIT - Clearwater National Forest All Units. STATE - Idaho. COUNTY - Clearwater. LEGAL - T37N, R1W, Section 32, 10 acres of BLM lands adjacent to the Lenore Tree Improvement Area, 15 miles west of Orofino, Idaho | |||||
| Back To Top | |||||
| Clearwater National Forest , Clearwater National Forest All Units | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| East Fork Potlatch Meadow Restoration EA |
- Watershed management - Wildlife, Fish, Rare plants |
In Progress Scoping Start 12/07/2012 Est. 215 Comment Period Legal Notice 03/2013 |
Expected: 05/2013 | 07/2013 | Meg Foltz 208-875-1717 mfoltz@fs.fed.us |
| Description: Restoration of about 45 acres of meadow and wetlands, installation of instream habitat structures along 2 miles of stream. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40180 | |||||
| Location: UNIT - Palouse Ranger District. STATE - Idaho. COUNTY - Latah. LEGAL - T40N R1W Sections 13, 23, 24, Boise Meridian Three miles east of Helmer, Idaho. | |||||
| Mush OHV Trail System EA |
- Recreation management | Developing Proposal Est. Scoping Start 09/2013 |
Expected: 04/2014 | 08/2014 | Adam McClory 208-875-1734 amcclory@fs.fed.us |
| Description: Development of new OHV riding opportunities in the Mush Saddle area to meet the growing demand for motorized recreation on the North Fork Ranger District. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35597 | |||||
| Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - T39N R8E and R9E; and T40N R8E and R9E, various sections The Mush Saddle Area of the North Fork Ranger District, approximately 30 miles northeast of Pierce and Weippe, Idaho. | |||||
| Tailhold Special Use Permit Issuance (Long Bear) CE |
- Special use management | Analysis Completed | Expected: 11/2012 Actual: 11/30/2012 |
06/2013 | Zilia Lewis 208-935-4255 zlewis@fs.fed.us |
| Description: The Palouse Ranger District proposes to issue Idaho Department of Lands a special use permit for approximately eight tailholds located on Forest Service system lands. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40175 | |||||
| Location: UNIT - Palouse Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - T39N R2E Section 19, Boise Meridian Long Meadow Creek of the Palouse Ranger District. | |||||
| Back To Top | |||||
| Clearwater National Forest , Lochsa Ranger District | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Chetwood Lode Exploration EA |
- Minerals and Geology | In Progress 215 Comment Period Legal Notice 06/15/2012 |
Expected: 06/2013 | 09/2013 | Clinton Hughes 208-983-5146 cehughes02@fs.fed.us |
| Description: The Lochsa Ranger District proposes to approve the claimant’s proposal to excavate four test pits to expose vein material to test for mineral values on the Lochsa Ranger District. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39562 | |||||
| Location: UNIT - Lochsa Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T33N, R7E, Sections 7, 17 and 18 Higgins Hump area | |||||
| Colette Mine Stream Restoration Project EA |
- Watershed management - Wildlife, Fish, Rare plants |
In Progress Scoping Start 04/18/2012 Est. 215 Comment Period Legal Notice 04/2013 |
Expected: 07/2013 | 01/2014 | Karen Smith 208-935-4252 kasmith03@fs.fed.us |
| Description: Rehabilitate 0.6 miles of stream and 15 acres of riparian/floodplain habitat resulting from past mining activities. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39057 | |||||
| Location: UNIT - Lochsa Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T35N, R06E, Section 32 The project lies 11 miles southeast of Weippe, Idaho along the mainstem of Lolo Creek near Utah Creek at the old Colette Mine site. | |||||
| Hemlock Butte Communication Site - SUP Modification CE *NEW LISTING* |
- Special use management | In Progress 215 Comment Period Legal Notice 02/19/2013 |
Expected: 03/2013 | 09/2013 | Teresa Trulock 208-935-4256 ttrulock@fs.fed.us |
| Description: The Lochsa District Ranger proposes to allow First Step Internet to modify its existing SUP to allow it to move its communication equipment from Hemlock Butte Lookout to a modular building near Timberline High School to provide better service. Web Link: http://www.fs.usda.gov/main/nezperce/landmanagement/projects | |||||
| Location: UNIT - Lochsa Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T36N R7E Sec 7 Boise Meridian Lochsa Ranger District - Idaho County - Hemlock Butte Lookout and Timberline High School | |||||
| Jim Brown Creek Inlet Realignment CE *NEW LISTING* |
- Watershed management - Road management |
In Progress Scoping Start 02/13/2013 |
Expected: 03/2013 | 07/2013 | Anne Connor 208-476-8235 aconnor@fs.fed.us |
| Description: This project involves realigning Jim Brown Creek at the inlet to a culvert that will be replaced by a box culvert/bridge. Web Link: http://www.fs.usda.gov/main/nezperce/landmanagement/projects | |||||
| Location: UNIT - Lochsa Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T35N R5E Sec 11, SW 1/4 NE 1/4, and SE 1/4 NW 1/4 Boise Meridian Lochsa Ranger District - Idaho County - Jim Brown Creek | |||||
| Lolo Insect & Disease EIS |
- Forest products - Watershed management - Road management |
Developing Proposal Est. NOI in Federal Register 04/2013 |
Expected: 07/2014 | 09/2016 | Lois Hill 208-935-4258 lrhill@fs.fed.us |
| Description: The Lolo Insect & Disease project proposes forest management and watershed improvement activities within the Lolo Creek wateshed, located approximately 16 air miles northeast from Kamiah, Idaho. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41466 | |||||
| Location: UNIT - Lochsa Ranger District. STATE - Idaho. COUNTY - Clearwater, Idaho. LEGAL - Townships 35 and 36 North, Ranges 6 and 7 East, Boise Meridian. The project area includes NFS lands within the 78,517-acre Lolo Creek drainage, approximately 16 air miles northeast of Kamiah, Idaho. | |||||
| Back To Top | |||||
| Clearwater National Forest , Nez Perce National Forest All Units | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Chetwood Lode Exploration CE |
- Minerals and Geology | In Progress 215 Comment Period Legal Notice 06/15/2012 |
Expected: 10/2012 | 06/2013 | Clinton Hughes 208-983-5146 cehughes02@fs.fed.us |
| Description: The Lochsa Ranger District proposes to approve the claimant’s proposal to excavate four test pits to expose vein material to test for mineral values. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40168 | |||||
| Location: UNIT - Lochsa Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T33N, R7E, Sections 7, 17 and 18, Boise Meridian The Higgins Hump area northwest of Lowell, Idaho. | |||||
| Last Chance #1 Lode Exploration CE |
- Minerals and Geology | In Progress 215 Comment Period Legal Notice 06/15/2012 |
Expected: 10/2012 | 06/2013 | Clinton Hughes 208-983-5146 cehughes02@fs.fed.us |
| Description: The North Fork Ranger District proposes to approve the claimant’s proposal to excavate three test pits to expose vein material to test for mineral values. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40169 | |||||
| Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - T37N, R6E, Section 33, Boise Meridian The French Mountain area of the North Fork Ranger District. | |||||
| Silver Lode Exploration CE |
- Minerals and Geology | In Progress 215 Comment Period Legal Notice 06/15/2012 |
Expected: 10/2012 | 06/2013 | Clinton Hughes 208-983-5146 cehughes02@fs.fed.us |
| Description: The North Fork Ranger District proposes to approve the claimant’s proposal to excavate seven to ten test pits to expose vein material to test for mineral values. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40167 | |||||
| Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - T37N, R6E, Section 27, Boise Meridian The French Mountain Area of the North Fork Ranger District | |||||
| Back To Top | |||||
| Clearwater National Forest , North Fork Ranger District | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Anne Veseth Memorial Trail CE *NEW LISTING* |
- Recreation management | In Progress 215 Comment Period Legal Notice 02/19/2013 |
Expected: 04/2013 | 06/2013 | Kearstin Edwards 208-476-8344 kkedwards@fs.fed.us |
| Description: Anne Veseth, a young firefighter on the North Fork Ranger District, died while working on the Steep Corner Fire in 2012. The North Fork District Ranger proposes the construction of a trail for visitors to access the fatality site to remember Anne. Web Link: http://www.fs.usda.gov/main/nezperce/landmanagement/projects | |||||
| Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - T40N R6E Sec 1 (Forest Service Land); T40N R6E Sec 12 and 13 (Potlatch & Idaho Department of State Lands) Boise Meridian North Fork Ranger District - Clearwater County | |||||
| Barnyard South Sheep EA |
- Watershed management - Forest products |
In Progress Scoping Start 12/14/2012 Est. 215 Comment Period Legal Notice 11/2013 |
Expected: 09/2014 | 03/2015 | George Harbaugh 208-935-4260 gharbaugh@fs.fed.us |
| Description: Vegetation and watershed improvements within the Washington Creek watershed of the North Fork Ranger District, Clearwater National Forest, Idaho. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38515 | |||||
| Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - Sections 5-8, T38N, R7E; Sections 3-10, 15-22, and 27-33, T39N, R7E; and Sections 28, 32, and 33, T40N, R7E, Boise Meridian, Clearwater County, Idaho Washington Creek watershed of the North Fork Ranger District, Clearwater National Forest | |||||
| Jule Shaft Lode Exploration EA |
- Minerals and Geology | In Progress 215 Comment Period Legal Notice 06/15/2012 |
Expected: 06/2013 | 08/2013 | Clinton Hughes 208-983-5146 cehughes02@fs.fed.us |
| Description: The North Fork Ranger District proposes to approve the claimant’s proposal to enter the existing Jule Mine Shaft to explore for and extract a large bulk sample over a five year period. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39566 | |||||
| Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - T37N, R6E, Section 34 French Mountain area | |||||
| Last Chance #1 Lode Exploration CE |
- Minerals and Geology | In Progress 215 Comment Period Legal Notice 06/15/2012 |
Expected: 06/2013 | 08/2013 | Clinton Hughes 208-983-5146 cehughes02@fs.fed.us |
| Description: The North Fork Ranger District proposes to approve the claimant’s proposal to excavate three test pits to expose vein material to test for mineral values on the North Fork Ranger District, Nez-Perce-Clearwater National Forests. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39563 | |||||
| Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - T37N, R6E, Section 33 French Mountain area | |||||
| Middle Bugs EA |
- Road management - Forest products |
In Progress 215 Comment Period Legal Notice 08/31/2012 |
Expected: 04/2013 | 09/2013 | Tammy Harding (208)935-2513 tharding@fs.fed.us |
| Description: Forest management and watershed improvement activities in the Middle Creek drainage between Lean-To-Ridge and Beaver Dam Creek Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34277 | |||||
| Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - 36N, R7E, Sections 1,2,11-15,17,20-23,26-28, and 34; T36N, R8E, Sections 4-9 Middle Creek drainage between Lean-To-Ridge and Beaver Dam Creek, approximately 11 air miles east of Pierce, Idaho | |||||
| New Red Lead Adit Exploration CE |
- Minerals and Geology | In Progress 215 Comment Period Legal Notice 06/15/2012 |
Expected: 06/2013 | 08/2013 | Clinton Hughes 208-983-5146 cehughes02@fs.fed.us |
| Description: The North Fork Ranger District proposes to approve the claimant’s proposal to enter the existing New Red Lead Adit to explore for and extract a bulk sample over a five month period. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39567 | |||||
| Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - T38N, R13E, Section 4 Black Lead Mountain area | |||||
| Pot Mountain Trail Maintenance and Improvements CE |
- Recreation management | Analysis Completed | Expected: 07/2012 Actual: 09/28/2011 |
09/2012 | Tammy Harding (208)935-2513 tharding@fs.fed.us |
| Description: The North Fork District would perform trail maintenance along 13 miles of Trail 478 from Moose Creek Trailhead to the junction with Fish Lake Trail west of Fish Lake and construct 3 miles of new trail from Pot Mountain to the junction of Road 5259, Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34943 | |||||
| Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - T38N, 39N, 40N, R8E Pot Mountain Trail | |||||
| Silver Lode Exploration CE |
- Minerals and Geology | In Progress 215 Comment Period Legal Notice 06/15/2012 |
Expected: 06/2013 | 08/2013 | Clinton Hughes 208-983-5146 cehughes02@fs.fed.us |
| Description: The North Fork Ranger District proposes to approve the claimant’s proposal to excavate seven to ten test pits to expose vein material to test for mineral values. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39565 | |||||
| Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - T37N, R6E, Section 27 French Mountain area | |||||
| Back To Top | |||||
| Clearwater National Forest , Palouse Ranger District | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Strychnine Pine EA |
- Fuels management - Forest products - Watershed management |
In Progress Scoping Start 11/16/2012 Est. 215 Comment Period Legal Notice 04/2013 |
Expected: 09/2013 | 10/2015 | George Harbaugh 208-935-4260 gharbaugh@fs.fed.us |
| Description: Vegetation, hazardous fuels, and watershed activities in the Strychnine Creek watershed on the Palouse Ranger District, Clearwater National Forest, Latah County, Idaho Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38517 | |||||
| Location: UNIT - Palouse Ranger District. STATE - Idaho. COUNTY - Latah. LEGAL - Sections 2-11, 15-22, 30 and 31, T42N, R2W; and Sections 33-36, T43N, R2W, Boise Meridian, Idaho Strychnine Creek watershed, Palouse Ranger District, Clearwater National Forest, Latah County, Idaho | |||||
| Tailhold Special Use Permit Issuance CE |
- Special use management | In Progress 215 Comment Period Legal Notice 06/15/2012 |
Expected: 07/2012 | 09/2012 | Zilia Lewis 208-935-4255 zlewis@fs.fed.us |
| Description: The Palouse Ranger District proposes to issue Idaho Department of Lands a special use permit for approximately eight tailholds located on Forest Service system lands. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39568 | |||||
| Location: UNIT - Palouse Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - T39N R2E Section 19 Long Meadow Creek area | |||||
| Upper Basin EA |
- Fuels management - Forest products |
Analysis Completed | Expected: 05/2013 Actual: 05/08/2013 |
03/2015 | George Harbaugh 208-935-4260 gharbaugh@fs.fed.us |
| Description: Timber harvest and fuels reduction in the Upper Elk Creek basin. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=32676 | |||||
| Location: UNIT - Palouse Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - T41N, R2-3E, BM. The anal;ysis area includes National Forest System lands north of the town of Elk River, ID in the Elk Creek drainage. | |||||
| Upper Corral Creek Meadow Restoration EA |
- Vegetation management (other than forest products) - Watershed management |
In Progress Scoping Start 12/21/2012 Est. 215 Comment Period Legal Notice 04/2013 |
Expected: 08/2013 | 11/2013 | Meg Foltz 208-875-1717 mfoltz@fs.fed.us |
| Description: Restoration of about 25 acres of meadow and wetlands, shaping of a shallow channel, installation of ditch plugs and removal of railroad berms to restore meadow hydrology along 2 miles of channel. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41143 | |||||
| Location: UNIT - Palouse Ranger District. STATE - Idaho. COUNTY - Latah. LEGAL - T40 N R2W Sec 1 and 2, T41N R2W Sec 25 and 36 Corral Creek, a tributary to the Potlatch River, 3 miles north of Deary, Idaho. | |||||
| Vassar Pond Ramp CE *NEW LISTING* |
- Special area management - Vegetation management (other than forest products) - Grazing management |
In Progress 215 Comment Period Legal Notice 02/19/2013 |
Expected: 03/2013 | 05/2013 | Meg Foltz 208-875-1717 mfoltz@fs.fed.us |
| Description: The Palouse District Ranger proposes to modify an existing pond, making the pond water source more accessible to livestock. Web Link: http://www.fs.usda.gov/main/nezperce/landmanagement/projects | |||||
| Location: UNIT - Palouse Ranger District. STATE - Idaho. COUNTY - Latah. LEGAL - T40N R2W Sec 1 Boise Meridian Palouse Ranger District - Latah County - Vassar Pond | |||||
| Back To Top | |||||
| Clearwater National Forest , Powell Ranger District | R1 - Northern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
| Granite Fire Salvage CE |
- Watershed management - Vegetation management (other than forest products) - Forest products - Fuels management |
Cancelled | N/A | N/A | Tam White 208-476-4541 twhite@fs.fed.us |
| Description: The Powell Ranger District of the Nez Perce-Clearwater National Forests proposes to harvest approximately 82 acres of dead and dying trees within the 350-acre Granite Pass Fire area, on the Powell Ranger District. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37441 | |||||
| Location: UNIT - Powell Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - T38N R14E Sections 1, 11 and 12 The proposed project is located along Forest Road 595 approximately seven miles northwest of Lolo Pass (about one mile west of Granite Pass). | |||||
| Granite Peak Burn Project CE |
- Fuels management | Developing Proposal Est. 215 Comment Period Legal Notice 03/2013 |
Expected: 11/2013 | 05/2014 | Tammy Harding 208-935-4263 tharding@fs.fed.us |
| Description: T39N, R14E, S16 near Granite Peak Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40742 | |||||
| Location: UNIT - Powell Ranger District. STATE - Idaho. COUNTY - Clearwater. LEGAL - Granite Peak T39N, R14E, S16 | |||||
| Lolo Pass Over Flowing Parking Area CE *NEW LISTING* |
- Recreation management - Facility management |
In Progress Scoping Start 01/16/2013 |
Expected: 03/2013 | 05/2013 | Molly Puchlerz 208-942-0303 mpuchlerz@fs.fed.us |
| Description: The Powell District Ranger seeks to create create an overflow parking area which would accommodate approximately 30 more passenger cars and/or vehicles without trailers. Web Link: http://www.fs.usda.gov/main/nezperce/landmanagement/projects | |||||
| Location: UNIT - Powell Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T38N R16E Sec 16 Boise Meridian Powell Ranger District - Idaho County - South side of US Highway 12, near the west entrance of Lolo Pass Visitor Center | |||||
| Parachute Hill Road 569 Snowmobile Crossing CE *NEW LISTING* |
- Facility management - Recreation management |
In Progress 215 Comment Period Legal Notice 01/16/2013 |
Expected: 03/2013 | 05/2013 | Molly Puchlerz 208-942-0303 mpuchlerz@fs.fed.us |
| Description: The Powell District Ranger is proposing to elminate the snowmobile corssing and trail at Forest Service Road 111 and US Highway 12, and develop the old roadbed into a snowmobile trail and highway crossing. Web Link: http://www.fs.usda/gov/main/nezperce/landmanagement/projects | |||||
| Location: UNIT - Powell Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T37N R14E Sec 28 Boise Meridian Powell Ranger District - Idaho County - Forest Service Road 569 | |||||
| Road 5621 Drainage Improvement CE *NEW LISTING* |
- Road management | In Progress Scoping Start 02/13/2013 |
Expected: 03/2013 | 05/2013 | Stephan Frazier 208-476-8293 safrazier@fs.fed.us |
| Description: The Powell District Ranger proposes to replace undersized and failing culverts in order to reduce the risk of failure and to enhance the prospect for runoff flows. Web Link: http://www.fs.usda.gov/main/nezperce/landmanagement/projects | |||||
| Location: UNIT - Powell Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T37N R13E Boise Meridian Powell Ranger District - Idaho County - Road 5621 Near Highway 12 | |||||
| Saddle Camp Veg. EA |
- Fuels management - Forest products |
In Progress Scoping Start 07/06/2009 Est. 215 Comment Period Legal Notice 01/2014 |
Expected: 04/2014 | 07/2014 | Karen Smith 208-935-4252 kasmith03@fs.fed.us |
| Description: Treatment along FS Road 107 to reduce fuels to provide for ingress and egress and to manage vegetation to more closely represent desired condition. Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=26091 | |||||
| Location: UNIT - Powell Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T36N., R.11 E., Sec 3-10, 15-21; T36N., R10E., sec 1, 12, 13, 14; T.37N, R11E. Sec 31-33 Indian Graves and Lost Creek drainages, Powell Ranger District | |||||
| South Fork Fish Creek - Powell Side CE *NEW LISTING* |
- Fuels management | Developing Proposal Est. 215 Comment Period Legal Notice 03/2013 |
Expected: 06/2013 | 10/2013 | Matthew Young 208-942-0344 mhyoung@fs.fed.us |
| Description: This proposed project is largely a contingency plan in the event a prescribed burn by another Forest should inadvertently encroach upon the Nez Perce-Clearwater Forest Powell Ranger District. Web Link: http://www.fs.usda.gov/main/nezperce/landmanagement/projects | |||||
| Location: UNIT - Powell Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T39N R14E Sec 23 Boise Meridian HUC4 Clearwater, HUC5 Crooked Fork Creek, HUC6 Upper Crooked For Creek, HUC7 Hopeful Creek | |||||
| Weir Creek Trail CE *NEW LISTING* |
- Recreation management | In Progress 215 Comment Period Legal Notice 01/16/2013 |
Expected: 03/2013 | 05/2013 | Katie Knotek 208-942-0302 kknotek@fs.fed.us |
| Description: The Powell District Ranger is proposing a trail reconstruction/construction project to provide access for Forest visitors to Weir Hot Springs and to mitigate current safety and resource issues along Weir Creek. Web Link: http://www.fs.usda.gov/main/nezperce/landmanagement/projects | |||||
| Location: UNIT - Powell Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T36N R11E Sec 13 Boise Meridian Powell Ranger District - Idaho County - Weir Creek Trail 931 | |||||
| Back To Top | |||||