Schedule of Proposed Actions (SOPA)

This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.

Report Contents (click to jump to a section):
- R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide)
- Salmon-Challis National Forest, Forestwide (excluding Projects occurring in more than one Forest)
- Salmon-Challis National Forest, Occurring in more than one District (excluding Forestwide)
- Salmon-Challis National Forest, Challis-Yankee Fork Ranger District
- Salmon-Challis National Forest, Leadore Ranger District
- Salmon-Challis National Forest, Lost River Ranger District
- Salmon-Challis National Forest, Middle Fork Ranger District
- Salmon-Challis National Forest, North Fork Ranger District
- Salmon-Challis National Forest, Salmon-Cobalt Ranger District


R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide)
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Greater Sage-grouse Management Direction - Idaho
EIS
- Land management planning
- Wildlife, Fish, Rare plants
In Progress
DEIS NOA in Federal Register
12/24/2013
Est. FEIS NOA in Federal Register
02/2014
Expected: 08/2014 09/2014 Glen Stein
801-625-5281
gstein@fs.fed.us
Description: The purpose of this project is to prepare environmental impact statements (EISs) and supplemental environmental impact statements to incorporate greater sage-grouse conservation measures into Bureau of Land Management land use plans and Forest Plans.
Location: UNIT - Boise National Forest All Units, Salmon-Challis National Forest All Units, Sawtooth National Forest All Units, Caribou-Targhee National Forest All Units. STATE - Idaho. COUNTY - Adams, Blaine, Bonneville, Camas, Caribou, Cassia, Elmore, Fremont, Madison. LEGAL - Not Applicable Boise NF, Salmon-Challis NF, Caribou-Targhee NF, Sawtooth NF, Curlew NG
Salmon-Challis National Forest, Forestwide (excluding Projects occurring in more than one Forest) R4 - Intermountain Region
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Issuing New O&G Permits to Replace Expired Permits
CE
- Special use management Developing Proposal
Est. Scoping Start
05/2015
Expected: 09/2015 12/2015 Patti Schwind
208-756-5147
pschwind@fs.fed.us
Description: Issuing 11 land based and 21 river based recreation Outfitting and Guiding permits.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39687
Location: UNIT - Salmon-Challis National Forest All Units. STATE - Idaho. COUNTY - Custer, Lemhi. LEGAL - Not Applicable Portions of 3 Ranger Districts on the Salmon-Challis National Forest
Issuing New Permits for Expired Outfitter & Guide Permits
CE
- Special use management In Progress
Scoping Start
07/03/2014
Expected: 12/2014 01/2015 Patti Schwind
208-756-5147
pschwind@fs.fed.us
Description: Issuing 10 land based & 3 river recreation Outfitting and Guiding permits
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39513
Location: UNIT - Salmon-Challis National Forest All Units. STATE - Idaho. COUNTY - Custer, Lemhi. LEGAL - Not Applicable Portions of 5 Ranger Districts on the Salmon-Challis National Forest
NRCS Snow Data Sites Special Use Permit Reissuance
CE
- Special use management On Hold N/A N/A Gail Baer
208-756-5128
gbaer@fs.fed.us
Description: The Natural Resources Conservation Service (NRCS) is requesting a reissuance of the Special Use Permits for operation, maintenance, and conversion of manual snow courses and automated SNOTEL data collection sites on Forest Service Lands.
Location: UNIT - Salmon-Challis National Forest All Units. STATE - Idaho. COUNTY - Custer, Lemhi. The manual snow courses and automated SNOTEL data collection sites are located across the Salmon-Challis National Forest outside of the Frank Church-River of No Return Wilderness
Salmon-Challis Forestwide Integrated Weed Management
EIS
- Vegetation management (other than forest products) In Progress
NOI in Federal Register
06/23/2011
Est. DEIS NOA in Federal Register
01/2015
Expected: 10/2015 12/2015 Jennifer Purvine
208-879-4162
jpurvine@fs.fed.us
Description: Implement adaptive and integrated invasive plant management on current and potential infested areas which would include inventory and assessment designed to support Early Detection Rapid Response, control methods, monitoring, and rehabilitation.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36537
Location: UNIT - Salmon-Challis National Forest All Units. STATE - Idaho. COUNTY - Blaine, Butte, Custer, Lemhi. Salmon-Challis National Forest outside of the Frank Church-River of No Return Wilderness Area
Salmon-Challis National Forest, Occurring in more than one District (excluding Forestwide) R4 - Intermountain Region
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Halstead Fire Salvage Project
EA
- Forest products In Progress
Comment Period
01/23/2014
Expected: 11/2014 04/2015 David Morris
208-879-4130
dmorris01@fs.fed.us
Description: Salvage marketable forest products from trees killed over 1,452 acres as a result of the Halstead Fire and those trees that may succumb to expansion of Douglas-fir beetle triggered by the fire. Areas include Challis-Yankee and Middle Fork Districts.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43556
Location: UNIT - Challis-Yankee Fork Ranger District, Middle Fork Ranger District. STATE - Idaho. COUNTY - Custer. LEGAL - Challis-Yankee Fork RD, T11N, R13E, Sections 13, 14, 22-24, and T11N, R14E, Section 18. Middle Fork RD, T12N, R11E, Sections 12, and 13; T12N, R12E, Sections 5, 6, 9, 15-17, 21, and 22. Project area is located in two areas one 4 air miles north of Stanley, ID and the other 14 air miles due northeast of Stanley, ID.
Panther (Big) Creek Hot Springs Geothermal Leasing
EIS
- Minerals and Geology In Progress
NOI in Federal Register
03/15/2012
Est. DEIS NOA in Federal Register
02/2015
Expected: 07/2015 09/2015 Kathryn Goessel
208-879-4158
kgoessel@fs.fed.us
Description: The Forest proposes to consent with stipulations to BLM issuance of 3 contiguous, noncompetitive geothermal leases.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37800
Location: UNIT - Salmon-Cobalt Ranger District, North Fork Ranger District. STATE - Idaho. COUNTY - Lemhi. LEGAL - T23N, R18E, sections 14, 15, 16, 21, 22, 23, 26, 27 & 28 An approximately 9-square-mile area in the Hot Springs Creek drainage of the lower Panther Creek watershed, 20 mi. WNW of Salmon, ID
Shoshone Bannock Tribes Crystal Springs Hatchery Support Project at Yankee Fork River and Panther Cr
EIS
- Special use management
- Wildlife, Fish, Rare plants
In Progress
NOI in Federal Register
05/23/2014
Est. DEIS NOA in Federal Register
04/2015
Expected: 03/2016 06/2016 Mary Hammer
208-756-5109
marylhammer@fs.fed.us
Description: Proposed permanent facilities include chinook salmon trapping, holding and acclimation facilities including weirs at Pole Flat Campground site on the Yankee Fork River and at the Cobalt Ranger Station on Panther Creek. In cooperation with BPA.
Location: UNIT - Salmon-Cobalt Ranger District, Challis-Yankee Fork Ranger District. STATE - Idaho. COUNTY - Custer, Lemhi. LEGAL - Not Applicable Pole Flat Campground area on the Yankee Fork River and Cobalt Ranger Station on Panther Creek.
Upper Yankee Fork Fuels Reduction Project
EA
- Fuels management In Progress
Comment Period
10/21/2010
Expected: 03/2015 06/2015 John Fowler
208-879-4168
jfowler@fs.fed.us
Description: The proposal is to prescribe burn under management conditions to reduce the continuous heavy ground and ladder fuels and reduce the overstory density in the upper reaches of Trapper Creek and the head of the Yankee Fork of the Salmon River.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=32990
Location: UNIT - Challis-Yankee Fork Ranger District, Middle Fork Ranger District. STATE - Idaho. COUNTY - Custer. LEGAL - T14N, R16E, Sections 3, 9-11, 13-17, 19-23, 26-34. All or parts of these sections. Sixteen miles west of Challis Idaho in the Yankee Fork of the Salmon River and Trapper Creek in the FCRONRW.
Salmon-Challis National Forest, Challis-Yankee Fork Ranger District R4 - Intermountain Region
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Challis Municipal Fuels Reduction Thinning Project
CE
- Fuels management Analysis Completed Expected: 10/2014
Actual: 10/15/2014
11/2014 John Fowler
208-879-4168
jfowler@fs.fed.us
Description: Thin 383 acres of mistle-toe infected Douglas-fir in the Garden Creek drainage, pile the slash for later burning and leave boles created for fuelwood gatherers. Location of project is the municipal watershed for Challis, Idaho.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44080
Location: UNIT - Challis-Yankee Fork Ranger District. STATE - Idaho. COUNTY - Custer. LEGAL - T13N, R18E, SEC 15,16, 21, 22, B.M. Portions of said sections. Garden Creek in Keystone Gulch and Merrimac Gulch, within the forest west of Challis.
Duke University -- new plot at Mahogany Creek north
CE
- Special use management Developing Proposal
Est. Scoping Start
02/2015
Expected: 04/2015 04/2015 Gail Baer
208-756-5128
gbaer@fs.fed.us
Description: Duke University is proposing an additional research site for studying drought resistance on a select species which they will plant at the site.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43014
Location: UNIT - Challis-Yankee Fork Ranger District. STATE - Idaho. COUNTY - Custer. LEGAL - N 44 11.307; W 113 44.387 This site is located near Mahogany Creek in the Pahsimeroi Valley.
East Fork Morgan Creek Habitat Improvement Fence
CE

   *NEW LISTING*
- Grazing management
- Vegetation management (other than forest products)
- Wildlife, Fish, Rare plants
Developing Proposal
Est. Scoping Start
11/2014
Expected: 02/2015 06/2015 Brianna Goehring
208-879-4137
bjgoehring@fs.fed.us
Description: The purpose of this project to effectively control livestock to protect and improve riparian conditions and fish habitat by constructing .87 mile of fence.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45777
Location: UNIT - Challis-Yankee Fork Ranger District. STATE - Idaho. COUNTY - Custer. LEGAL - T16N, R22E, Sections 31, 32; T15N, R22E, Section 5, B.M. Project area is approximately 20 miles northeast of Challis located just south of the East Fork Morgan Creek.
Mosquito Flat Fuels Reduction Project
EA
- Fuels management In Progress
Scoping Start
06/21/2012
Expected: 01/2015 05/2015 David Morris
208-879-4127
dmorris01@fs.fed.us
Description: Prescribed broadcast burning and tree cutting proposal to reduce hazardous fuels in the WUI in and around the Mosquito Flat area
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39625
Location: UNIT - Challis-Yankee Fork Ranger District. STATE - Idaho. COUNTY - Custer. LEGAL - T14N, R17E, S33 Areas to the immediate south, west, and north of the Mosquito Flat area. Generally, the headwater drainage of the Challis creek watershed, approximately 8 air miles west of Challis, ID.
Pahsimeroi Allotment Spring Rehabilitation
CE

   *NEW LISTING*
- Grazing management
- Vegetation management (other than forest products)
- Wildlife, Fish, Rare plants
- Watershed management
- Heritage resource management
Developing Proposal
Est. Scoping Start
11/2014
Expected: 02/2015 05/2015 Joshua Edwards
208-588-3400
jledwards@fs.fed.us
Description: Fencing five wetland springs to improve the conditions at the locations. One site will have stock ponds breached and water piped off site. All fences will be placed outside of the wetland community type to minimize impacts to the soft soils.
Location: UNIT - Challis-Yankee Fork Ranger District. STATE - Idaho. COUNTY - Custer. LEGAL - The location of the springs is T11N, R23E, Sections 17, 20, 28, and 29. The project occurs on the east side of the Lost River range, roughly 42 miles Southeast of Challis, Idaho. The location of the springs is T11N, R23E, Sections 17, 20, 28, and 29.
Reauthorization Of Grazing on the Spud Creek and Marco Creek Allotments
EA
- Grazing management In Progress
Scoping Start
09/20/2007
Est. Comment Period
10/2014
Expected: 05/2015 06/2015 Faith Ryan
208-756-5562
fryan@fs.fed.us
Description: The Challis-Yankee Fork Ranger District proposes to authorize continued livestock grazing on the Spud and Marco Creek Allotments consistent with existing management in order to continue to meet or move toward desired resource conditions (see project
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=21209
Location: UNIT - Challis-Yankee Fork Ranger District. STATE - Idaho. COUNTY - Custer. LEGAL - Marco Creek Alloment:T10N,R18E,Sec10,15,17,18,20,&21-SpudCreek Allotment T10N, R17 andR18E,Sec 5,,67,8,9,10,15,16,17,&21 The Spud Creek and Marco Creek Alloments is located in the East Fork of the Salmon River
Thompson Creek Modified Plan of Operation
EIS
- Land ownership management
- Minerals and Geology
In Progress
DEIS NOA in Federal Register
03/21/2014
Est. FEIS NOA in Federal Register
01/2015
Expected: 03/2015 05/2015 Kathryn Goessel
208-879-4158
kgoessel@fs.fed.us
Description: The Thompson Creek Mining Company (TCMC) submitted a plan of operations for continued mining through approximately 2030. The POO proposes new surface disturbance on a total of approximately 500 acres of private and public (BLM & NFS) lands.
Web Link: http://www.blm.gov/id/st/en/prog/nepa_register/TCM-exlx_EIS.html
Location: UNIT - Challis-Yankee Fork Ranger District. STATE - Idaho. COUNTY - Custer. LEGAL - T11N, R17E, Secs, 6, T11N, R16E, Secs, 1-4, 11-12, T12N, R16E, Secs 25, 34-36, T12N, R17E, Secs 31 The Thompson Creek Mine is located in Custer County, Idaho approximately 5 miles north of the Salmon River and 35 miles southwest of the county seat of Challis.
West Fork Morgan Creek Vegetation Management Project
EA
- Vegetation management (other than forest products)
- Watershed management
- Fuels management
On Hold N/A N/A Wesley Case
970-625-6861
wacase@fs.fed.us
Description: Treat 3,200 acres of conifer stands to restore/maintain healthy forest conditions, improve resistence to insect/disease, and improve resilience to wildfires/other natural disturbances; tree cutting/removal to occur in Camas Creek Idaho Roadless Area.
Location: UNIT - Challis-Yankee Fork Ranger District. STATE - Idaho. COUNTY - Custer. LEGAL - T 16 N, R 18 E, Sections 15, 16, 20-23, 25-29, 33-36; T 15 N, R 18 E, Section 2, B.M. West Fork of Morgan Creek approximately 14 miles northwest of Challis, Idaho
Salmon-Challis National Forest, Leadore Ranger District R4 - Intermountain Region
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Flume Creek Exploration Drilling
CE
- Minerals and Geology On Hold N/A N/A Julie Hopkins
208-756-5279
juliehopkins@fs.fed.us
Description: Exploration drilling from two drill pad locations in the Flume Creek drainage on the Leadore Ranger District
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39458
Location: UNIT - Leadore Ranger District. STATE - Idaho. COUNTY - Lemhi. LEGAL - T19N, R25E, Section 9 Flume Creek drainage, Leadore Ranger District, approximately 5 miles north of Tendoy, Idaho.
Soapstone Springs Exclosure Expansion
CE
- Grazing management Developing Proposal
Est. Scoping Start
03/2015
Expected: 06/2015 09/2015 Sara Norman
208-768-2505
scnorman@fs.fed.us
Description: The project will expand the exclosure around a developed headbox at Soapstone Springs on the Grizzly Hill C&H Allotment, protecting the spring source.
Location: UNIT - Leadore Ranger District. STATE - Idaho. COUNTY - Lemhi. LEGAL - NW 1/4, SE 1/4, Sec. 36, T. 17N, R. 26E. The project is located on the Grizzly Hill C&H Allotment, approximately 6 miles northwest of Leadore, Idaho.
Salmon-Challis National Forest, Lost River Ranger District R4 - Intermountain Region
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Sawmill Canyon Vegetation Management Project
EA
- Fuels management
- Forest products
In Progress
Scoping Start
12/29/2011
Expected: 10/2014 06/2015 David Morris
208-879-4127
dmorris01@fs.fed.us
Description: Project will implement various sivicultural managment techniques to reduce fuels, restore decadent aspen stands, provide commercial forest products, and address insect epidemic that is currently occurring in the drainage.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37108
Location: UNIT - Lost River Ranger District. STATE - Idaho. COUNTY - Custer, Lemhi. LEGAL - T12N, R25E, S.1,2; T12N, R26E,S. 5-8; T13N, R25E, S. 25,36; T13N, R26E, S. 30, 31, Boise Meridian Project Area is located in Sawmill Canyon the headwaters of the Little Lost River drainage, 35 miles NNE of Mackay, Idaho
Antelope Valley Grazing Allotments
EA
- Grazing management In Progress
Comment Period
07/10/2014
Expected: 01/2015 07/2015 Joshua Edwards
208-588-3405
jledwards@fs.fed.us
Description: Authorize grazing on the Antelope, Leadbelt, Dry Fork, Sawmill Canyon and Stoddard Canyon grazing allotments.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=19137
Location: UNIT - Lost River Ranger District. STATE - Idaho. COUNTY - Butte, Custer. LEGAL - parts of T 3 & 4 N, R 23 E Antelope Valley in Butte and Custer County encompassing 46,375 acres, 18 miles south of Mackay
Ballpark Road Re-Location
EA
- Road management Analysis Completed Expected: 10/2014
Actual: 10/21/2014
06/2015 Melissa Fowler
208-588-2224
mfowler01@fs.fed.us
Description: To re-locate approx. 600 yards of Road #714 in the "Ballpark" area of the Lost River Ranger District. The re-location will bypass a wet area where resource damage is occurring. The proposal includes decommissioning the abandoned road route.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38011
Location: UNIT - Lost River Ranger District. STATE - Idaho. COUNTY - Custer. LEGAL - T7N, R18E, Section 21, B.M. The "Ballpark" is located in the upper end of the North Fork of the Big Lost River Drainage, 35 miles west of Mackay, Idaho
Bell Mountain Allotment, Deep Creek Spring Pipeline Extension
CE
- Grazing management On Hold N/A N/A Joshua Edwards
208-588-2224
jledwards@fs.fed.us
Description: Add a section of pipeline and one trough to an existing developed spring and pipeline. This project would add a trough on NFS administered land to better distribute livestock across the pasture.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37885
Location: UNIT - Lost River Ranger District. STATE - Idaho. COUNTY - Butte. LEGAL - SW ¼ of NW ¼ of Section 14, Township 10N Range 27E, Butte County First developed spring north of the Deep Creek drainage on the Bell Mountain Allotment. Zone 11N North 802729.359, East 4900937.945, Datum NAD83
Lost River Small Batch Fences
EA
- Grazing management Developing Proposal
Est. Comment Period
12/2014
Expected: 03/2015 06/2015 Wayne Berrett
208-588-3418
wtberrett@fs.fed.us
Description: Project proposes to construct five segments of fence totalling 1.25 miles and installing three cattleguards on Forest roads to better manage livestock in Copper Basin, North Fork and Kane Canyon areas.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37963
Location: UNIT - Lost River Ranger District. STATE - Idaho. COUNTY - Custer. LEGAL - Road/Ramey T6N R21E Sec 23 SW ¼, North Fork T7N R19E Sec 26, 35, 36, Kane Lake TH T6N R19E Section 27 NE ¼ Road/Ramey- 17 miles SW of Mackay, ID , North Fork- 28 miles W of Mackay, ID, Kane Lake TH- 28 miles WSW of Mackay, ID. All in Custer Co.
Mackay Old Warehouse Site Administrative Site Conveyance
CE
- Land ownership management In Progress
Scoping Start
02/20/2014
Expected: 07/2015 09/2015 Randy Thomas
208-756-5138
rthomas@fs.fed.us
Description: The Forest proposes to sell one historic warehouse building and two out building sheds in Mackay, Idaho on a 0.48-acre fenced parcel with utilities.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=23524
Location: UNIT - Lost River Ranger District. STATE - Idaho. COUNTY - Custer. LEGAL - T7N, R24E, Section28, Lots 1-3, Block 21 The Mackay site is 0.48 acres on the south corner of the intersection of Park Avenue and Salmon Street, Mackay, ID
Sawmill Aspen Treatment (North Side)
CE
- Wildlife, Fish, Rare plants Developing Proposal
Est. Scoping Start
11/2014
Expected: 01/2015 07/2015 Mike Foster
208-588-2224
mfoster02@fs.fed.us
Description: Restore aspen viability by removing conifer competition from existing aspen stands. Treatment area is app. 198 acres in size. Treatment area is located in Sawmill Canyon, north side of Sawmill Canyon Road (FR101) from Firebox Creek to Warm Creek.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=31088
Location: UNIT - Lost River Ranger District. STATE - Idaho. COUNTY - Lemhi. LEGAL - Portions of T13N, R26E, sections 20, 29, 31, and 32. T12N, R26E, sections 5-9, 15-17, 21-23, 26, 27, 34, and 35. T11N, R26e, sections 2 and 3. The project is located on the Salmon-Challis National Forest, Lost River Ranger District, Little Lost River drainage, Sawmill Canyon, Lemhi County, Idaho
Salmon-Challis National Forest, Middle Fork Ranger District R4 - Intermountain Region
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Sulphur Creek Aircraft landing Strip
EA
- Special use management On Hold N/A N/A Gail Baer
208-756-5128
gbaer@fs.fed.us
Description: Re-issuance of a special use permit for a portion of the Sulphur Creek landing strip which is located on national Forest lands.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=15530
Location: UNIT - Middle Fork Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T 14 N, R 9 E, SE 1/4, NW 1/4, Section 21, B.M. West of Sulphur Creek Ranch, which is located approximately 4 miles up Sulphur Creek from it's mouth west of the Middle Fork of the Salmon river.
Salmon-Challis National Forest, North Fork Ranger District R4 - Intermountain Region
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Clementine Placer
EA
- Minerals and Geology On Hold N/A N/A Julie Hopkins
208-756-5279
juliehopkins@fs.fed.us
Description: The operators have proposed six test pits approximately 20 ft. by 20 ft. in size and one to four feet deep. The pits are designed to be excavated down to bedrock which varies somewhat.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41208
Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Lemhi. LEGAL - T.25N. R.20E. – section 1, Boise Meridian, Lemhi County, Idaho. Located on the west side of Hughes Creek, just above where the west fork of Hughes Creek meets the main fork.
Sagewood Salvage Project
CE
- Forest products
- Fuels management
Developing Proposal
Est. Scoping Start
09/2014
Expected: 07/2015 10/2015 Margaret Seaberg
208-865-2711
margareteseaberg@fs.fed.us
Description: Removal of dead and dying trees on less than 250ac to improve the overall health of stands, reduce hazardous fuels, improve timber productivity and provide several different kinds of forest products including commercial and personal use products.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45287
Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Lemhi. LEGAL - T.25.N., R.20.E., Sec. 35; T.24.N., R.20.E, Sec. 1, 2, 11, 12 Within the Sage Creek and Donnelly Drainages on the North Fork Ranger District of the Salmon-Challis National Forest.
Upper North Fork HFRA Ecosystem Restoration Project
EIS
- Wildlife, Fish, Rare plants
- Road management
- Vegetation management (other than forest products)
- Fuels management
- Forest products
- Watershed management
In Progress
FEIS NOA in Federal Register
07/25/2014
Expected: 10/2014 10/2014 Margaret Seaberg
208-865-2711
margareteseaberg@fs.fed.us
Description: Integrated hazardous fuels & forest restoration project in the Upper North Fork Watershed. Approx. 41,000 acre planning area from Gibbonsville to Lost Trail Ski Area being considered for treatments. Three Idaho Roadless Areas are in the project area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33793
Location: UNIT - North Fork Ranger District. STATE - Idaho. COUNTY - Lemhi. LEGAL - Portions of T27N, R20-R22E and T26N, R20-22E, Boise Meridian Upper North Fork Watershed of the Salmon River
Salmon-Challis National Forest, Salmon-Cobalt Ranger District R4 - Intermountain Region
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Duck Creek Diversion and Pipeline
CE
- Special use management On Hold N/A N/A Gail Baer
208-756-5128
gbaer@fs.fed.us
Description: Issuance of a special use permit for a water diversion pipeline and access road. Water diversion will replace an existing diversion. The new structure will include a lockable headgate with a measureable flow and a passive cylinder fish screen
Location: UNIT - Salmon-Cobalt Ranger District. STATE - Idaho. COUNTY - Lemhi. LEGAL - SE1/4 of the SW1/4, Section 30, T18N, R17E, BPM Duck Creek, tributary to Camas Creek
Gold Star Exploration Drilling Project
CE
- Minerals and Geology On Hold N/A N/A Julie Hopkins
208-756-5279
juliehopkins@fs.fed.us
Description: Proposal to core drill 10 vertical and angled holes from previously constructed drill pads. Sumps will be 10' x 10' x 6 feet. Approximately 1.25 miles new road will need to be constructed to access the site.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40297
Location: UNIT - Salmon-Cobalt Ranger District. STATE - Idaho. COUNTY - Lemhi. LEGAL - T23N, R22E, Section 11 Gold Star Creek, tributary to Tower Creek, Accessed via BLM Route #111. Approximately 8 miles NE of Salmon, ID.
Hawkeye Gulch Exploration Trenching Project
CE
- Minerals and Geology In Progress
Scoping Start
09/17/2014
Expected: 10/2014 10/2014 Glenwood Brittain
208-756-5169
gbrittain@fs.fed.us
Description: Derrold Slavin of Salmon, Idaho proposed up to four test trenches to explore for minerals near Hawkeye Gulch and Moose Creek on National Forest lands administered by the Salmon-Cobalt Ranger District, Salmon-Challis National Forest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45296
Location: UNIT - Salmon-Cobalt Ranger District. STATE - Idaho. COUNTY - Lemhi. LEGAL - Not Applicable Near Hawkeye Gulch and Moose Creek on National Forest lands administered by the Salmon-Cobalt Ranger District, Salmon-Challis National Forest. Close to the junction of FSR 60023 & 65078.
Sanderson Ditch Conversion to buried Pipeline
CE
- Special use management Developing Proposal
Est. Scoping Start
12/2014
Expected: 03/2015 03/2015 Gail Baer
208-756-5128
gbaer@fs.fed.us
Description: Bury pipe in the existing Sanderson Ditch. The pipe will be in the existing ROW area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43019
Location: UNIT - Salmon-Cobalt Ranger District. STATE - Idaho. COUNTY - Lemhi. LEGAL - Not Applicable Sanderson Ditch is a diversion from Wallace Creek and diverts water to private land owners within the Savage Ranch subdivision.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD).

To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.

This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.