|
|
|
|
|
Deerfield Wind Energy Development Special Use Permit EIS
|
The Deerfield Wind Project Final EIS was completed in December 2011 and the Record of Decision was signed on January 3, 2012. The decision was to implement Alternative 2 that authorizes the issuance of a special use permit to Deerfield Wind, LLC to construct and operate a 15-turbine commercial wind power facility on National Forest lands. A formal complaint was filed in U.S. District Court for the District of Vermont by multiple parties on February 24, 2012 citing multiple issues of concern. Project implementation is pending the outcome of the ongoing litigation. Location SummaryGreen Mountain National Forest, Towns of Readsboro and Searsburg District: Manchester Ranger District Project DocumentsPost-Decision- Supplemental Information Report - Blade Length Change
- Request for Input - Draft Supplemental Information Report (PDF 178kb)
Memo dated May 13, 2013 inviting public input to the DRAFT Supplemental Information Report for the review of new information regarding proposed changes to turbine length. Written input should be provided by June 14, 2013. - DRAFT Supplemental Information Report - Proposed Turbine Blade Length Change (PDF 378kb)
DRAFT Supplemental Information Report for the Deerfield Wind Project Final EIS and Record of Decision; Review of New Information Regarding Proposed Changes to Turbine Blade Length dated May 2013. - Specialist Reports
- Land Use Specialist Report (PDF 6kb)
Specialist report documenting the review of new information regarding the proposed blade length change as it pertains to land use (Bayer, 2013a). - Socioeconomic Specialist Report (PDF 6kb)
Specialist report documenting the review of new information regarding the proposed blade length change as it pertains to socioeconomics (Bayer, 2013b). - Soil, Water, Wetlands and Air Specialist Report (PDF 6kb)
Specialist report documenting the review of new information regarding the proposed blade length change as it pertains to soil, water, wetlands and air quality (Burt, 2012). - Botany Specialist Report (PDF 6kb)
Specialist report documenting the review of new information regarding the proposed blade length change as it pertains to sensitive plant species and non-native invasive plants (Deller, 2012). - Impact Analysis Report - Air Quality (PDF 155kb)
Impact analysis report prepared by edr Companies documenting the review of new information regarding the proposed blade length increase as it pertains to air quality (edr Companies, 2013a). - Impact Analysis Report - Noise (PDF 1136kb)
Impact analysis report prepared by edr Companies documenting the review of new information regarding the proposed blade length change as it pertains to noise (edr Companies, 2013b). - Impact Analysis Report - Telecommunications (PDF 1162kb)
Impact analysis report prepared by edr Companies documenting the review of new information regarding the proposed blade length change as it pertains to telecommunications (edr Companies, 2013c). - Impact Analysis Report - Shadow Flicker (PDF 1086kb)
Impact analysis report prepared by edr Companies documenting the review of new information regarding the proposed blade length change as it pertains to shadow flicker (edr Companies, 2013d). - National Park Service Noise Report (PDF 100kb)
Report prepared by the National Park Service - Natural Sounds and Night Skies Division documenting their review of new information regarding the proposed blade length change as it pertains to noise (Fristrup and McKenna, 2013). - Roads, Infrastructure and Transportation Specialist Report (PDF 6kb)
Specialist report documenting the review of new information regarding the proposed blade length change as it pertains to roads, infrastructure and transportation (Kamb, 2013). - Vegetation Resource Specialist Report (PDF 6kb)
Specialist report documenting the review of new information regarding the proposed blade length change as it pertains to the vegetation resource (Klink, 2013). - Visual Quality Specialist Report (PDF 54kb)
Specialist report documenting the review of new information regarding the proposed blade length change as it pertains to visual quality (Kokx, 2013). - Heritage and Cultural Resources Specialist Report (PDF 40kb)
Specialist report documenting the review of new information regarding the proposed blade length change as it pertains to heritage and cultural resources (Lacy, 2013). - Recreation and Wilderness Character Specialist Report (PDF 8kb)
Specialist report documenting the review of new information regarding the proposed blade length change as it pertains to recreation and wilderness character (Reichert, 2013). - Fisheries Specialist Report (PDF 6kb)
Specialist report documenting the review of new information regarding the proposed blade length change as it pertains to the fisheries resource (Roy, 2013). - Wildlife - Birds and Bats Specialist Report (PDF 103kb)
Specialist report documenting the review of new information regarding the proposed blade length change as it pertains to birds and bats (Sease, 2013a). - Wildlife - TES, Black Bears and Other Wildlife Specialist Report (PDF 76kb)
Specialist report documenting the review of new information regarding the proposed blade length change pertaining to threatened, endangered and sensitive (TES) species, black bears, and other wildlife species (Sease, 2013b).
- Proposed Turbine Change
- Deerfield Wind, LLC Proposed Turbine Change Memo (PDF 65kb)
Memo from Deerfield Wind, LLC dated October 8, 2012 requesting change to the turbine configuration approved in the ROD (Habig, 2012). - Sound Study (PDF 1095kb)
Resource Systems Group, Inc. updated noise study dated September 12, 2012 (RSG, 2012). - Shadow Flicker Study
- Visual Study
- Wildlife Study (PDF 144kb)
Stantec Consulting updated radar and raptor survey study (Stantec, 2012a). - Wildlife Study - Attachment 1 (PDF 369kb)
Attachment 1 for the Stantec Consulting updated radar and raptor survey study (Stantec, 2012b). - Telecommunications Study
- Supplemental Information Report - Bat Mortality Estimates
- Appeal Documents
- Appalachian Trail Conservancy Appeal (PDF 122kb)
Appeal filed by the Appalachian Trail Conservancy dated February 24, 2012. - Appalachian Trail Conservancy Appeal Closure Letter (PDF 158kb)
Appalachain Trail Conservancy Appeal closure letter from the Appeal Deciding Officer dated March 29, 2012. - Green Mountain Club Appeal (PDF 113kb)
Appeal filed by the Green Mountain Club dated February 24, 2012. - Green Mountain Club Appeal Closure Letter (PDF 159kb)
Green Mountain Club Appeal closure letter from the Appeal Deciding Officer dated March 29, 2012, - Modified Lighting Mitigation (PDF 71kb)
Final modified language to the Deerfield Wind Project Record of Decision associated with radar activated lighting technology. This was agreed to by the Green Mountain Club, the Appalachian Trail Conservancy, and the Forest Service during the informal resolution meeting process. - Defenders of Wildlife, The Wilderness Society, Green Berkshires, Inc. Appeal (PDF 643kb)
- Appeal Exhibit 1 - Letter from the GWNF (PDF 30kb)
- Appeal Exhibit 2 - Deerfield Readsboro Road Map (PDF 329kb)
- Appeal Exhibit 3 - Cut and Fill Locations (PDF 48kb)
- Appeal Exhibit 4 - Email from Matt Schweisberg (PDF 51kb)
- Appeal Exhibit 5 - KCW Field Inspection Report (PDF 1041kb)
- Defenders of Wildlife, The Wilderness Society, Green Berkshires, Inc. Appeal Recommendation (PDF 770kb)
Appeal Reviewing Officer appeal recommendation letter dated April 9, 2012. - Defenders of Wildlife, The Wilderness Society, Green Berkshires, Inc. Appeal Decision (PDF 264kb)
Appeal Deciding Officer appeal decision dated April 9, 2012. - Vermonters for a Clean Environment Appeal (PDF 5024kb)
- Vermonters for a Clean Environment Appeal Recommendation (PDF 668kb)
Appeal Reviewing Officer appeal recommendation letter dated April 9, 2012. - Vermonters for a Clean Environment Appeal Decision (PDF 267kb)
Appeal Deciding Officer appeal decision dated April 9, 2012. - Lindholm Appeal (PDF 357kb)
- Lindholm Appeal Recommendation (PDF 334kb)
Appeal Reviewing Officer appeal recommendation letter dated April 9, 2012. - Lindholm Appeal Decision (PDF 265kb)
Appeal Deciding Officer appeal decision dated April 9, 2012. - Shea Appeal (PDF 13kb)
- Shea Appeal Recommendation (PDF 257kb)
Appeal Reviewing Officer appeal recommendation dated April 9, 2012. - Shea Appeal Decision (PDF 265kb)
Appeal Deciding Officer appeal decision dated April 9, 2012. - Town of Wilmington Appeal (PDF 1129kb)
- Appeal Enclosure - Flood Pictures (PDF 1933kb)
- Appeal Enclosure - Hydrology Report (PDF 2148kb)
- Town of Wilmington Appeal Dismissal Letter (PDF 125kb)
Appeal Deciding Officer appeal dismisal letter dated March 29, 2012.
- Appeals
Decision- Deerfield Wind Project Record of Decision (PDF 981kb)
The Record of Decision (ROD) was signed by Forest Supervisor Colleen Pelles Madrid on January 3, 2012. Alternative 2, Reduced Turbines in the Western Project Site has been selected for implementation. The ROD provides the details of Alternative 2 and the rationale for why it was selected. - Decision Legal Notice (PDF 71kb)
Legal Notice for the Deerfield Wind Project Record of Decision published in the Rutland Herald newspaper of record on January 10, 2012. The Legal Notice provides information for how to submit an administrative appeal for the decision. The 45-day appeal period ended on February 24, 2012.
|
|
|
|
|
|